Grissan AD facility for William Grants Riverside

  • Contract Value - £2.1 Million
  • Project Completion Date - 2016
  • Timescale - 5 months from order to handover

IC Electrical completed the AD Facility for Grissan Renewable Energy. The plant exports up to 1.5MWe and 3MW gas to grid.

Electrical Design

  • MCC Control Panel Design & Manufacture
  • MV Switchgear Design & Procurement
  • LV Switchgear Design & Manufacture
  • PLC/ICA Panel Design & Manufacture
  • MV & LV Distribution
  • LV Cabling to motors & Drives
  • Instrumentation Design & Specification
  • Fibre optic, Ethernet, Profibus DP, Modbus & Profinet
  • Lighting Design
  • Containment Systems
  • Safety Instrumented Systems
  • Lightning Protecting & Power Earthing
  • SCADA System
  • FDS
  • Software
  • Hazardous Area Design

 

Electrical Installation, Testing & Commissioning

  • Ingress & Positioning of MV/LV Switchgear & Control Panels
  • MV Cable installation and testing in co-ordination with the DNO
  • LV Cable Installation and testing
  • Supply and Installation of Distribution Transformers
  • CHP Engine Cabling
  • Supply and installation of all Maintenance switches
  • Containment Systems
  • Communications
  • Fibre optic, Ethernet, Profibus DP, Modbus & Profinet
  • Control Cabling
  • Small Power & Lighting
  • Safety related system cabling
  • Earthing (above ground) installation
  • Hazardous areas Installation
  • Instrumentation Configuration & Commissioning